Steel for Pier Footing880 viewsThe first layer of steel reinforcement for the pier footing
|
|

View into Warm Room879 viewsThis panoramic view (please forgive the blending artifacts) shows the window and door between the observatory and warm room.
|
|

Rough Drywall View into Observatory857 viewsThe pier footings can just be seen in this view into the observatory.
|
|

NGC 2336854 viewsNGC 2336, a spiral galaxy in Camelopardalis. Captured with Maxim DL and CCDCommander, calibrated and stacked in CCDStack, processed in PixInsight and finished in Photoshop. Unfortunately, seeing wasn't the best that night.
|
|

Concrete Pouring851 viewsConcrete is poured into the pier footing. The total load for the day was 5 1/2 cubic yards of concrete, weighing about 21,500 lbs.
|
|

Stucco Complete View to South838 viewsThe stucco is complete and the column installed in this view looking south.
|
|

East Elevation834 views
|
|

Roof Framed View to Northwest833 viewsThe curved rafters are bolted in place while the steel struts are attached.
|
|

Completed Footings Panorama East828 viewsCompleted footings in a panoramic view to the east.
|
|

Pier Footings Set824 viewsThe cement work on the pier footing is complete. The piers are slightly offset from the walls and significantly offset from a north-south perspective.
|
|

View to South822 viewsA view to the south with better color balance than the one posted a couple of weeks ago.
|
|

Roof Moves: Closed819 viewsThis view, looking east, shows the roof closed. Good to compare with the shot of the roof open.
|
|