Most viewed - Construction |
Roof Complete View South856 viewsRoof on and base stucco complete, looking to the south.
|
|
Concrete Pouring837 viewsConcrete is poured into the pier footing. The total load for the day was 5 1/2 cubic yards of concrete, weighing about 21,500 lbs.
|
|
Rough Drywall View into Observatory832 viewsThe pier footings can just be seen in this view into the observatory.
|
|
Stucco Complete View to South817 viewsThe stucco is complete and the column installed in this view looking south.
|
|
Roof Framed View to Northwest813 viewsThe curved rafters are bolted in place while the steel struts are attached.
|
|
Pier Footings Set810 viewsThe cement work on the pier footing is complete. The piers are slightly offset from the walls and significantly offset from a north-south perspective.
|
|
Completed Footings Panorama East809 viewsCompleted footings in a panoramic view to the east.
|
|
Framed Arch Detail802 viewsPlywood is being used to create the top plate that runs underneath the curved rafters.
|
|
View to South802 viewsA view to the south with better color balance than the one posted a couple of weeks ago.
|
|
Digging the Footings796 viewsA backhoe makes quick work of digging the footings.
|
|
Observatory with Clouds795 viewsSome nice lenticular clouds are over Iron Spring and Beauty Mountains.
|
|
Roof Moves: Closed794 viewsThis view, looking east, shows the roof closed. Good to compare with the shot of the roof open.
|
|
|