Last additions - Observatory |
Completed Footings View East791 viewsView of the footings looking east.Jan 20, 2009
|
|
Completed Footings Panorama East809 viewsCompleted footings in a panoramic view to the east.Jan 20, 2009
|
|
Completed Footings987 viewsThe footings for the building and the slab for the equipment room are set. This view is looking southwest.Jan 20, 2009
|
|
Pier Footings Set810 viewsThe cement work on the pier footing is complete. The piers are slightly offset from the walls and significantly offset from a north-south perspective.Jan 20, 2009
|
|
Pier Inspection888 viewsMy daughter inspects the completed pier footingJan 20, 2009
|
|
Steel Set872 viewsThe steel is set in the ground ready for the concrete to be poured.Jan 10, 2009
|
|
Setting Pier Blocks1359 viewsBlocks are set around the perimeter of the pier footing. Another layer of blocks will go on this layer, then the center will be filled with concrete and two sonotubes of concrete will bring the pier base up to floor level.Jan 10, 2009
|
|
Concrete Pouring837 viewsConcrete is poured into the pier footing. The total load for the day was 5 1/2 cubic yards of concrete, weighing about 21,500 lbs.Jan 10, 2009
|
|
Blocks Set Panorama675 viewsA two-shot panorama of the construction site after the first day of work on the foundationJan 10, 2009
|
|
Foundation Panorama710 viewsA two shot panorama capturing the first layer of the foundationJan 10, 2009
|
|
Set Blocks East View704 viewsBlocks set, cement curing, view to the east.Jan 10, 2009
|
|
Cement into the Pump709 viewsCement goes into the cement pumpJan 10, 2009
|
|
114 files on 10 page(s) |
|
|
|
|
|
|
8 | |
|